Carbon-plastic is 50 times harder than steel. Weigths 10 kg.
Beton is 5 kg per cubic decimeter.
1000 offices $75,000 each.
Armed-beton stand 20 meters on 20 meters is 400 tonnes.
Scheleton module (200 * 4) + (30 * 6) + (200 * 2) = 1780 cubic decimeters.
Scheleton all: 1780 * 10 kg * 1000 floors = 17,800 tonnes.
Foundation is 400 * 400 * 10 kg = 1,600,000 tonnes.
Magadan is seen (400 km away), airport is seen, ships are seen, the building is higher than small mountain nearby.
Several upper levels (penthouse) have carbon-plastic stands.

Helicopter lifts 20 tonnes (5x5x10=250).
Plane lifts 200 tonnes. Mria lifts 4000 tonnes.
Scheleton module is positioned in the foundation by 900 helicopters.
They lift square net 30 on 30 segments.
Ethyl stage - fly mode, space-out mode.
Space-out mode: foil windows.